
Add to Cart
Product Description
Take a look at the smart storage solution with doors and spacious space for literally anything. It features storage shelves on the right side, storage compartments and heavy-duty steel hanging rail behind the left door. The product is manufactured with solid particleboard that is durable and long-lasting. The product is also a great option for hallways and dens to store any items you wish and keep your home uncluttered
1. Selection of pine hard and firm, adhere to the quality of attention to detail, adhere to high cost performance, no odor more healthy.
Product name | Clothes Wardrobe |
Materials | E1 environmental protection plate |
Features | Put clothes, bags, shoes, quilts, etc |
Size | Spot 60,80,100,120(customizable) |
Color | Optional |
Trademarks | Customizable |
Bearing capacity | 50 kg per floor |
Advantages | Environmental, durable, mildew proof, waterproof |
Directions | Living room, bedroom, balcony, etc |
Starting order | 10 pieces |
Payment | TT / Western Union Remittance / Credit Card / Electronic Cheque / Letter of Credit |
Production time | Within 15 working days of receipt of deposit |
Packing | Combined packaging, standard export cartons and polyfoam packaging |
A:Yes, we are a professional manufacturer for Home Furnishing with 13 years experience.
Q: How can you guarantee your final quality?
A: As for quality control, we’ve approved four testing procedures:
Initial inspection, re-inspection, final inspection and sampling inspection.
Q: What kind of Certification did you pass?
A: The material can be provided with E0 level and E1 related certificates through the professional assessment of relevant institutions.
Q:What is the advantage of your company?
A: Our materials are of high quality, healthy environment, high cost performance and diverse design styles.
Q:Can you customize it according to our request?
A:Of course. We can do customized according to your special requirement and you need to provide us some technical data such as dimension and drawing.
Q:How long is the production lead time?
A:8 to 30 days is always to be required for an official order while after receiving 30% deposit and the relevant final confirmed details completely.
Q: How is the MOQ of required?
A: We welcome any amount under your requested. but a competitive price is always depends on the quantity increase gradually.
Visit Our Factory & Company
Contact Our Customer Service 24h Online